Bangalore dairy sales Milk in two kinds of packets: Plastic Bag & Tetra Packs. Each of these packets goes through three steps: Filling, Sealing and Labelling. The company has three filling machines, 6 sealing machines and 3 labelling machines. Each of these 12 machines can work for exactly 8 hours in a day. One box of Tetra Packs requires 20 minutes for filling, 1 hour for sealing and 20 minutes for Labelling. The box of Plastic Bags requires 15 minutes for filling, 1 hour for sealing and 10 minutes for labelling. If the dairy has to manufacture only 40 boxes of Tetra Packs then how many machine hours are utilised on that day?
Each box of Tetra Pack takes 20 minutes for filling, 1 hour for sealing and 20 minutes for Labelling.
Total Machine Hours Utilised = 800 + 2400 + 800 = 4000 = 6623 hours.
Hence option (b)