Calculate the amount of work done in raising a glass of water weighing through a height of 40 cm. Take,
Step 1: Given data
Mass of a glass of water is,
The height through which the glass is raised is,
Acceleration due to gravity is to be taken as,
Step 2: Calculating the amount of work done
When a body is lifted through a certain height, work done is given as,
where, is mass, is the acceleration due to gravity and is height.
Substituting the given values, we get,
Therefore, the work done is .