Calculate the amount of work done in shifting a charge of 2C from a point A to B having potential 10V and -5V respectively.
Calculate the work done to carry a charge of 3 C, if the potential difference between two points is 10 V.
Calculate the potential difference between two points, if 1500 J of work is done to carry a charge of 50C from one point to other?