Consider the following statements:
Prevention or elimination of swelling can be brought by
1. providing an impervious apron around the structure
2. pre-wetting the ground to a moisture content equal to equilibrium moisture content
3. packing downward loads large enough to exceed swelling pressures
4. chemically stabilizing the soil with lime
Which of these statements are correct?