wiz-icon
MyQuestionIcon
MyQuestionIcon
1
You visited us 1 times! Enjoying our articles? Unlock Full Access!
Question

Find the cost of sinking a tube well 280 m deep, having diameter 3 m at the rate of Rs.3.60 per cubic meter. Find also the cost of cementing its inner curved surface at Rs.2.50 per square meter.

Open in App
Solution

Given: The diameter of the well is 3 m and it is 280 m deep.

Volume of cylinder =πr2h
=(227×(32)2×280)m3=1980 m3
Cost of sinking the tube well
= Volume × cost per cubic meter
=Rs.3.60×1980=Rs.7128

Inner curved surface area of the well =2πrh
=(2×227×32×280)m2
=2640 m2

The cost of cementing the inner C.S.A
=Rs.(2.50×2640)=Rs.6600

Hence, the cost of sinking and cementing are Rs.7128 and Rs.6600 respectively.

flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
Join BYJU'S Learning Program
CrossIcon