Question
Following data refers to the jobs (P, Q, R, S) which have arrived at a machine for scheduling. The shortest possible average flow time is ____ days.
Job
Processing Time (days)
P
15
Q
9
R
22
S
12
31
Open in App
Solution
The correct option is
A
31
SPT rule given shortest average
Jobs
Time
Job flow time
Q
9
0 + 9 = 9
S
12
9 + 12 = 21
P
15
21 + 15 = 36
R
22
36 + 22 = 58
Total = 124
Job flow time = 124 days
So, applying SPT
Average job flow time
=
124
4
=
31
d
a
y
s
Suggest Corrections
0
Similar questions
Q.
Six jobs arrived in a sequence as given below:
Jobs
Processing Time (days)
I
4
II
9
III
5
IV
10
V
6
VI
8
Average flow time (in days) for the above jobs using Shortest Processing Time rule is
Q.
A machine shop processes custom orders from variety of clients. A machining centre in a job shop for a local manufacturing company has five unprocessed jobs remaining at a particular point in time. The jobs are labeled
J
1
,
J
2
,
J
3
,
J
4
and
J
5
in the order they entered the shop. The respective processing times and due dates are given in the table below:
Job
Processing
time (in days)
Due date (in days)
J
1
13
65
J
2
32
48
J
3
34
34
J
4
4
36
J
5
5
35
When the jobs are assumed to enter the shop in the sequence of SPT (shortest Processing Time), the mean flow time and average tardiness, respectively, are
Q.
Four jobs are to be processed on a machine as per data listed in the table.
Job
Processing time (in days)
Due date
1
4
6
2
7
9
3
2
19
4
8
17
Using the Shortest Processing Time (SPT) rule, total tardiness is
Q.
Processing times (including step times) and due dates for six jobs waiting to be processed at a work centre are given in the table. The average tardiness (in days) using the shortest processing time rule is ___ (correct two decimal places).
Job
Processing time (days)
Due date (days)
A
3
8
B
7
16
C
4
4
D
9
18
E
5
17
F
13
19
Q.
Consider a single machine workstation to which jobs arrive according to a Poisson distribution with a mean arrival rate of 12 jobs/hour. The process time of the workstation is exponentially distributed with a mean of 4 minutes. The expected number of jobs at the workstation at any given point of time is _____ [round off to the nearest integer]
View More
Join BYJU'S Learning Program
Grade/Exam
1st Grade
2nd Grade
3rd Grade
4th Grade
5th Grade
6th grade
7th grade
8th Grade
9th Grade
10th Grade
11th Grade
12th Grade
Submit
Related Videos
First Udasi
HISTORY
Watch in App
Explore more
First Udasi
Standard IX History
Join BYJU'S Learning Program
Grade/Exam
1st Grade
2nd Grade
3rd Grade
4th Grade
5th Grade
6th grade
7th grade
8th Grade
9th Grade
10th Grade
11th Grade
12th Grade
Submit
AI Tutor
Textbooks
Question Papers
Install app