Following data refers to the jobs (P, Q, R, S) which have arrived at a machine for scheduling. The shortest possible average flow time is ____ days.
Job Processing Time (days)
P 15
Q 9
R 22
S 12


  1. 31

Open in App
Solution

The correct option is A 31
SPT rule given shortest average
Jobs Time Job flow time
Q 9 0 + 9 = 9
S 12 9 + 12 = 21
P 15 21 + 15 = 36
R 22 36 + 22 = 58
Total = 124

Job flow time = 124 days

So, applying SPT

Average job flow time =1244=31 days