The correct option is A 2.08
Hatched portion shows the total runoff and dotted portion shows the total infiltration. ∴ Total runoff = (8−3)×1560+(7−3)×1560 =[(8−3)+(7−3)]×1560=2.25cm
Total precipitation=2×1560+2×1560+8×1560+7×1560+1.25×1560+1.25×1560 =(2+2+8+7+1.25+1.25)×1560=5.375cm W−index=Totalprecipitation−RunoffDurationofrainfallinhr=5.375−2.2590/60
=2.083 cm/hr ≃ 2.08 cm/hr