For a inflow of 25 m3/day and percolation rate of 12 minutes, the absorption area required (in m2, rounded off to nearest integer) for dispersion trench is
420
Open in App
Solution
The correct option is A 420 Absorption area required=Q(Lday)(204√t)lm2day whereQ=25m3day=25000lday t=12minutes