The correct option is C 16 days
(3 men+4 boys) can earn Rs.(210+7), i.e., Rs.30.00 in one day. And (11 men+13 boys) can earn Rs.(830÷8), i.e., Rs.103.75 in one day. Find out the earning of 1 man and 1 boy and then proceed.
3m+4b=30.0011m+13b=103.75}⇒1m=5,1b=3.75
Wages for 7m+9b=7×5+9×3.75=Rs.68.75 per day
∴ No. of required days =Rs.1100+Rs.68.75=16