If 72 men can build a wall 280 m long in 21 days, how many men will take 18 days to build a similar type of wall of length 100 m?
In 21 days 280 m wall build by 72 man
Then in one day 280 m wall build by man =21×72
Or one day one m wall build by man=21×72280
Or one day 100 m wall build by man =21×72×100280
Or 18 days 100 m wall build by man=21×72×100280×18=30 man