In a hydroelectric power plant, moving water is used for driving the wheels of a turbine to generate electricity. If the change in kinetic energy of turbine is 1200 J in 2 minutes then the power generated is
10 W
Change in kinetic energy =1200 J
Time taken = 2 min = 120 s
The potential energy of the waterfall is utilised to move the turbine blades and the change in kinetic energy would be equal to the work done which is equal to 1200 J. Power is defined as the work done per unit time
Power = work donetime=1200120=10W.