In the System Development Life Cycle the client should be involved in : (1) design (2) development (3) implementation of new system.

A
1,2
No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
2,3
No worries! We‘ve got your back. Try BYJU‘S free classes today!
C
1,3
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
All of these
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
Open in App
Solution

The correct option is D All of these

In the System Development Life Cycle the client should be involved in:-

Systems development life cycle (SDLC), is a term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information system.

1) Design:-

The requirements identified in the Requirements Analysis Phase are transformed into a System Design Document that accurately describes the design of the system and that can be used as an input to system development in the next phase.

2) Development:-

Development is When the real work begin when a programmer, network engineer and/or database developer are brought on to do the major work on the project. This work includes using a flow chart to ensure that the process of the system is properly organized. The development phase marks the end of the initial section of the process.

3) Implementation of new system:-

When the majority of the code for the program is written. Additionally, this phase involves the actual installation of the newly-developed system. This step puts the project into production by moving the data and components from the old system and placing them in the new system via a direct cut over. While this can be a risky (and complicated) move, the cut over typically happens during off-peak hours, thus minimizing the risk. Both system analysts and end-users should now see the realization of the project that has implemented changes.


917096_917788_ans_0782c8d7302d4bb39092b6fab9f42c2f.PNG

flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Importance and Features of Business Environment
BUSINESS STUDIES
Watch in App
Join BYJU'S Learning Program
CrossIcon