It is proposed to design flexible pavement for 20 years by CBR method. The period of construction is 2 years and the traffic at the end of 2 years is 500CVPD, then the cumulative standard axles in msa is (lane distribution factor = 0.75, vehicle damage factor = 2.5 and traffic growth rate = 7.5%)