It is proposed to widen and strengthen an existing 2-lane NH section as a divided highway. The existing traffic in one direction is 2500 Commercial Vehicles (CV) per day. The construction will take 1 year. The design (CBR) of soil subgrade is found to be 5%. Given, traffic growth rate for CV = 8%, vehicle damage factor = 3.5 (standard axles per CV) design life = 10 yr and traffic distribution factor = 0.75. The cumulative standard axles (msa) computed are