The correct option is
B 70To predict the time required to complete
3.5 miles, which is not included in the given data set, we first find out the trend line that best represents the data set.
Let's plot the given data set on a scatter plot diagram with miles covered (independent variable) on
x-axis and time taken (dependent variable) on
y-axis.
Logically, it is very clear that if Jordan wants to cover longer distance, the required time to cover will also be more.
In the above scatter plot, the cyan line represents the line of best fit, which passes though
(x1,y1)=(2,40) and
(x2,y2)=(3,60).
The slope of the line of best fit is
m=y2−y1x2−x1
⇒ m=60−403−2=201=20
Hence, the equation of the line of best fit is
y−y1=m(x−x1)
⇒y−40=20(x−2)
⇒y−40=20x−40
⇒y−40+40=20x−40+40
⇒y=20x
By substituting the covering distance
x=3.5 miles in the above equation of the line of best fit, we get the required time as
y=20×3.5=70 minutes
∴ Jordan needs
70 minutes to complete
3.5 miles walk, i.e., option (b.) is the correct one.