Machines A and B always operate independently and at their respective constant rates. When working alone, machine A can fill a production lot in 5 hours, and machine B can fill the same lot in x hours. When the two machines operate simultaneously to fill the production lot, it takes them 2 hours to complete the job. What is the value of x ?