Match List-I (Situation) with List-II (Stress Path) and select the correct answer using the codes given below the lists:
List-I
A. Embankment construction
B. Excavation of a pit
C. Hydrostatic loading
D. Lateral expansion of a backfill
List-II
1. Stress path moves in left side upward direction
2. Stress path moves in left side downward direction
3. Stress path moves in right side upward direction
4. Stress path moves along the horizontal axis