Match List-I (Situation) with List-II (Stress Path) and select the correct answer using the codes given below the lists:
List-I
A. Embankment construction
B. Excavation of a pit
C. Hydrostatic loading
D. Lateral expansion of a backfill
List-II
1. Stress path moves in left side upward direction
2. Stress path moves in left side downward direction
3. Stress path moves in right side upward direction
4. Stress path moves along the horizontal axis

A
A - 3 , B - 2 , C - 1, D - 4
No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
A - 3 , B - 2 , C - 4, D - 1
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
C
A - 2 , B - 3 , C - 4, D - 1
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
A - 2 , B - 3 , C - 1, D - 4
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution

The correct option is B A - 3 , B - 2 , C - 4, D - 1
In hydrostatic loading Δσh=Δσv So stress path moves along a horizontal axis. Lateral expansion of backfill means Δσh<0 and Δσv=0 so stress path moves in left side upward direction. During embankment constructiont Δσh=0 and Δσv>0 so stress path moves in right side upward direction. During excavation of a pit Δσh=0 and Δσv<0 so stress path moves in left side downward direction.

flag
Suggest Corrections
thumbs-up
1
similar_icon
Similar questions
View More
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Stress Distribution Due to Point Load
FOUNDATION ENGINEERING
Watch in App
Join BYJU'S Learning Program
CrossIcon