Total length of road = 5413 miles
Length of road repaired per week by workers =913 miles
Required number of weeks to repair the road
= Total length of road to be repaired divided by length of road repaired by workers per week
Required number of weeks to repair the road 5413 miles =5413÷913
=5413×139=549=9×69=6 weeks
Hence,workers can repair the road of the city in 6weeks.