Mettur tunnel hydropower plant is on ______ river.
Mettur is an industrial plant located in Salem district in the state of Tamil Nadu and is constructed across the Kaveri River in Tamil Nadu. It was constructed in 1934 and took 9 years to complete. Maximum height and width of the Dam are 214 and 171 feet respectively.