CameraIcon
CameraIcon
SearchIcon
MyQuestionIcon
MyQuestionIcon
1
You visited us 1 times! Enjoying our articles? Unlock Full Access!
Question

Mr Mosafeer employs 5 men who together can build a wall 12 m long in 3 days.
(a) How long would it take the men to build a wall 20 m long?
(b) How long would it take 3 men to build the 12 m wall?
(c) If the 12 m wall must be built in 2 days, how many more men must
Mr Mosafeer employ?

Open in App
Solution

Dear Student,

a) 12 meter long wall gets buid in=3 days1 meter long wall buid in=312=1420 meter long wall gets buid in =14×20=5 daysb) more men will take less time to build the war, hence number of man and 5 men buids the 12 m wall in =3 days1 men can build the wall in=3×5=15 days3 man builds the wall in =153= 5 daysc) number of man who can build the wall in 3 days=5 mennumber of men who can build the wall in 1 day=3×5=15 mennumber of men who can build the wall in 2 days=152=7.5 menhence 7.5-5=2.5 more men are requiredhere 2.5 can be taken as 3 because 2.5 men is not possibleHence 3 more man are required.
Regards,

flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Joint Variations
MATHEMATICS
Watch in App
Join BYJU'S Learning Program
CrossIcon