The correct option is
A
Blue Nile river
नीली नील नदी
Explanation: The Grand Ethiopian Renaissance Dam (GERD) which was formerly known as the Millennium Dam and sometimes referred to as
Hidase Dam is located in Ethiopia, on the Blue Nile River about 40km east of Sudan. It will be
Africa’s biggest hydropower project (6.45 GW) when completed as well as the seventh largest in the world. The
hydroelectric dam is being built on the Blue river (It is tributary of the world’s longest river
Nile ), in the lowlands of Ethiopia. GERD’s storage capacity is 74
billion cubic meters of water. Ethiopia began construction in 2011 at a cost of $4 billion and is approximately 70% complete as of Nov 2019. Ethiopia wants to fill up the gigantic reservoir in 6 years. However, the mega dam has caused a row between Egypt and Ethiopia, with Sudan caught in between, which some fear could lead to war, and the US and world Bank is now helping to mediate. It is under construction in
the Benishangul-Gumuz region of Ethiopia, on
the Blue Nile River. व्याख्या : ग्रांड इथियोपियाई पुनर्जागरण बांध (जीईआरडी) जिसे पहले मिलेनियम बांध के रूप में जाना जाता था और कभी-कभी हिडेस डैम के रूप में जाना जाता है, इथियोपिया में स्थित है, यह सूडान से लगभग 40 किमी पूर्व में ब्लू नाइल नदी पर स्थित है, जो पूरी होने के बाद दुनिया की सातवीं सबसे बड़ी और अफ्रीका की सबसे बड़ी जल विद्युत परियोजना (6.45 गीगावॉट) होगी। इथियोपिया के तराई क्षेत्रों में नीली नदी (यह दुनिया की सबसे लंबी नदी नील की सहायक नदी है) पर बनाया जा रहा है। जीईआरडी की भंडारण क्षमता 74 बिलियन क्यूबिक मीटर है। इथियोपिया में इसका निर्माण 2011 में 4 बिलियन डॉलर की लागत से शुरू हुआ था और इस बाँध का लगभग 70% काम नवंबर 2019 तक पूरा हो चुका है। इथियोपिया 6 वर्षों में विशाल जलाशय को भरना चाहता है। हालांकि, मेगा बांध के कारण मिस्र और इथियोपिया के बीच विवाद उत्पन्न हो गया है।, इस पूरे घटनाक्रम में सूडान बीच में फंस गया है । अमेरिका और विश्व बैंक अब मध्यस्थता करने में मदद कर रहे हैं। उक्त बाँध इथियोपिया के बेनिशांगुल-गामुज क्षेत्र में ब्लू नाइल नदी पर निर्माणाधीन है।