True
Let sides of a triangle be a = 51m, b = 37m and c = 20m.
Now, semi-perimeter of triangle,
s=a+b+c2=51+37+202=1082=54m
∴ Area of triangle =√s(s−a)(s−b)(s−c) [by Heron’s formula]
=√54(54−51)(54−37)(54−20)
=√54×3×17×34
=√9×3×2×3×17×17×2
=3×3×2×17=306m2
Given that the cost of leveling per m2 = Rs.3
∴ The cost of leveling per 306 m2=3×306=Rs.918