The correct option is C 27th day
The equation is:
y=3.5x+30
We have to find the day at which the number of production is more than 121, i.e., y should be greater than 121.
Putting y = 121 in the equation, we get:
⇒121=3.5x+30
⇒121−30=3.5x
⇒91=3.5x
⇒913.5=x
⇒x=26
On 26th day, the number of production will be 121.
So on next day the production will be more than 121
∴ Number of days required=26+1=27