The amount of work done in moving 2.5 C charge over a potential difference 330 mV is:
What amount of work done is needed in moving 2 C charge through a potential difference of 8 V?
Work done in moving an electric charge and difference in potential is called potential difference here what is the work done
The work done in moving a charge of 5 C across the potential difference of 13 V is