The correct option is D 150000 sq. ft. output
From the data, till 150000 sq. ft., the electricity cost increased in geometric progression with a common ratio of 1.5. Thereafter it increased in arithmetic progression with common difference of 10000.25.
Total cost =Labour +Material +Electricity + Administration cost
We therefore have the following :
OutputElectrcityTotal CostCost per sq.ft.25003800763503.054500057001092002.1847500085501415501.8873100000128251748251.748312500019237.5208987.51.671915000028856.25245556.251.637017500038856.5288506.51.648620000048856.75336856.751.6843
Thus, the estimated cost per square foot of output is minimum for 150000 square feet output.