Question

The increment cost curves of three generators are shown, the demand on the system is 240 MW.
For economic load dispatch the generators schedule is





A
P1=20 MW,P2=70 MW,P3=150 MW
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
B
P1=20 MW,P2=150 MW,P3=70 MW
No worries! We‘ve got your back. Try BYJU‘S free classes today!
C
P1=50 MW,P2=50 MW,P3=90 MW
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
P1=20 MW,P2=90 MW,P3=130 MW
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution

The correct option is A P1=20 MW,P2=70 MW,P3=150 MW
G1 is high cost generator, so it will supply minimum power,
P2+P3=220 MW, P1=20 MW
From the curve,(IC210)=0.1(P250)
IC2=0.1×P2+5
For economic dispatch
IC2=IC3
0.1×P2+5=12
P2=70 MW
P3=150 MW

flag
Suggest Corrections
thumbs-up
0
similar_icon
Similar questions
View More
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
ELD Within the Plant Without Transmission Losses
POWER SYSTEMS
Watch in App
Join BYJU'S Learning Program
CrossIcon