Length of the semicircular tunnel =2 km.
∴l=2000 m
Diameter of the semicircular tunnel =7 m
∴ Radius of tunnel =72
∴r=3.5 m
Volume of semicircular tunnel =12× Volume of circular tunnel
=12×πr2l
=12×227×3.5×3.5×2000
=11×0.5×3.5×2000
=11×5×35×20
=38500 m3
∴ Expenditure for digging (semicircular) the tunnel at the rate Rs. 600 per m3
=38,500×600
= Rs. 2,31,00,000
∴ Expenditure for plastering inner side of the tunnel at the rate of Rs. 50 per m2
=22000×5
= Rs. 11,00,000