The correct option is A Flow
The measurement of workability for tremie concrete will be appropriate by determination of its flow. concrete for tremix placement should have a very high slump of about 150 mm to 200 mm
⋅ The tremix concrete placement method uses a pipe, through which concrete is placed below water level The placement of tremix concrete is carried out through a tube, usually 10−12 inch pipe.