There are 3 cab companies A, B and C. They provide cab service at different time slots. The time taken for the trip depends upon the driver skill. The bar graph shown below gives the details.
The time taken for cab C1 of company A to reach the destination is ______.
90 min
From the graph, the time taken by cab C1 of company A is given by the corresponding value on the vertical axis, i.e. 90 minutes.