Two plates are connected by fillet welds of size 8 mm and subjected to a tensile force of 350 kN. The thickness of each plate is 12 mm. The yield stress and ultimate stress of steel are 250 MPa and 410 MPa respectively. As per IS 800 : 2007, the length (l) required to transmit the load is ____mm. (The welding is done at site).