What will be the correct sequence that minimizes the total elapsed time required to complete the following jobs on three machines M1, M2 and M3 in the order M1→M3→M2?
Three solids of masses m1, m2 and m3 are connected with weightless string in succession and are placed on a frictionless table. If the mass m3 is dragged with a force T, the tension in the string between m2 and m3 is