Which of the following is not a disadvantage of building large dams for generating hydroelectric power?
The construction of dams for generating hydroelectric power and then installation of transformers and their connection to the national grid has the following four main disadvantages:
A) Disturbance of the natural ecosystem in the surrounding forest area.
B) Disruption of the plants and animal's life.
C) Displacement of people on a large scale.
D) Disruption of the aquatic ecosystem.