Work of 490J is done on a load of mass 5kg to lift it to a certain height. calculate the height through which the load is lifted.
Step 1: Data provided,
Work(W)=490JMass(m)=5kg
Step 2: Formula used,
Workdone=Force×displacementForce=Mass×acceleration
Step 3: Calculation,
Theminimumforcerequiredtoliftthebodyofmassmupward(F)=mgWork=force×Displacement=mg×hor,W=mgh⇒h=Wmg=4905×9.8m=49049m=10m
Hence, the height of the object is 10m
250 J work is done to lift a bucket of mass 10 kg at a certain height. Calculate the height through which the bucket is lifted. Consider acceleration due to gravity as 10 ms2.
A weight lifter lifted a load of 200 kgf to a height of 2.5 m in 5 s. Calculate :(i) the work done, and (ii) the power developed by him.Take g=10 N kg−1.
A work of 4900 J is done on a load of mass 50 kg to lift it to a certain height. Calculate the height through which the load is lifted?
Work done on a body of mass 10 kg to lift it through a certain height is 490 J. Calculate the height through which the body is lifted.
A work of 4900J is done on a load of mass 50kg to lift it to a certain height. Calculate the height through which the load is lifted.