Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same job. How long should it take both A and B, working together but independently, to do the same job?
A’s 1 hour’s work = 18
B’s 1 hour’s work = 110
(A+B)’s 1 hour’s work = (18+110)=940
∴ Both A and B will finish the work in 409hours.