A can lay a railway track between two given stations in 16 days and B can do the same job in 12 days. With the help of C, they did the job in 4 days only. Then, C alone can do the job in how many days?
48/5 days
(A+B+C)’s 1 day’s work = 14, A’s 1 day’s work = 116, B’s 1 day’s work = 112
∴ C’s 1 day’s work = (116 + 112) = (14 − 748) = 548
So, C alone can do the work in 485 = 935 days