A city is going to install the rapid sand filter after the sedimentation tank. Use the following data:
Design loading rate to the filter = 200 m3/m2/d ;
Design now rate = 0.5 m3/s
Surface area per filter box = 50 m2
The surface area required for the rapid sand filter will be