A fill having a volume of 1,50,000 cum is to be constructed at a void ratio of 0.8. The borrow pit soil has a void ratio of 1.4. The volume of soil required (in cubic meters) to be excavated from the borrow pit will be
Vs=V11+e1=V21+e
V1=V2×1+e11+e2
=150000×1+1.41+0.8
=2,00,000m3