The correct option is B 2212 days
Ratio of times taken by A and B =1:3
The time difference is (3−1)2 days while B takes 3 days and A takes 1 day.
If difference of time is 2 days, B takes 3 days.
If difference of time is 60 days, B takes (32×60)=90 days.
So, A takes 30 days to do the work.
A's 1 day's work =130
B's 1 day's work =190
(A+B)'s 1 day's work =(130+190)=490=245
∴ A and B can do the work in 452=2212 days.