A man completes 3/8 of a job in 12 days. At this rate, how many more days will it take him to finish the job?
20
The man completes 3 parts of work out of 8 parts in 12 days. So, 5 parts is remaining.
As the man works at the same rate,
Parts of work done per days required = constant= \(\frac{3}{12}) = 5/n
So, the number if days required, n = 20 days