No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
the amount of work done by the system is =−12(P2−P1)(V2−V1)
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
C
the amount of work done on the system is =(P2−P1)(V1−V2)
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
the amount of work done by the system is =12(P2−P1)(V2−V1)
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution
The correct option is C the amount of work done by the system is =−12(P2−P1)(V2−V1) Given: P-V graph containing a closed path ABCA.
Solution:
For a closed cyclic path,work done is given by area of the closed path. If the cyclic process is in clockwise direction work done by the system is positive.
If the cyclic process is in anticlockwise direction work done by the system is negative.
Area of a triangle=12×base×height
So, area of the above triangle=12×(V2−V1)×(P2−P1)
As the cyclic process is in anticlockwise direction, work done by the system is negative.