Identify the correct sequence of events carried out in preparation of soil.
Watering of dry soil → Ploughing →Breaking the crumbs → Levelling of soil
Dry soil requires watering before ploughing. After ploughing, the crumbs in the field have to be broken with a plank. Then the field is levelled for sowing as well as for irrigation purposes with the help of a leveller.