The correct option is B 412days
Let a man takes p days to do a piece of work and a boy takes q days to do the same work.
Then,
One day work of a man = 1p
One day work of a boy = 1q
Since, 2 men and 3 boys can do a piece of work in 337 days i.e. 247 days,
So, one day work of 2 men and 3 boys will be 724.
⇒2p+3q=724.....(i)
Also, as 3 men and 2 boys can do a piece of work in 31543 days i.e. 14443
⇒3p+2q=43144.....(ii)
Now, let x=1p and y=1q
Substituting 1p=x and1q=y in(i)and(ii),
2x+3y=724.....(iii)
3x+2y=43144.....(iv)
Multiplying (iii) by 2 and (iv) by 3, we get
4x+6y=712.....(v)
9x+6y=4348.....(vi)
Subtracting (v) from (vi), we get
5x=43−2848=1548
⇒x=1548×5
⇒x=116
Now, substituting x=116 in (iii), we get
2×116+3y=724
⇒3y=724−18=7−324
⇒3y=16
⇒y=118
∴ q = 18 i.e. one boy can do a piece of work in 18 days
So, 4 boys will take 14 times number of days taken by a boy to do the same work.
As,q4=184=92=412,
Therefore, 4 boys will finish the work in 412 days.
Hence, the correct answer is option (2).