If four bags of cement are needed to make 1 cubic metre of concrete, then bags are needed to make 5 cubic metres of concrete.
If 3 sacks of concrete will make 12 square feet of sidewalk, predict how many sacks of concrete are needed to make 40 square feet of sidewalk.