Running at their respective constant rates. Machine A takes 4 days longer to produce widgets than Machine B. At these rates, if the two machines work together to produce 2x widgets in 3 days, how many days would it take Machine A alone to produce 52 x widgets?

Open in App
Solution

Days required to produce x widgets by B D
Days required to produce xD widgets by B 1 Day

Days required to produce x widgets by A D+4
Days required to produce xD+4 widgets by A 1 Day

Days required to produce 2x widgets when both work together 3 Day
Days required to produce 2x3 widgets when both work together 1 Day

So, xD+4+xD=2x32D2+2D12=0D2+D6=0D=2

Hence Days required to produce x widgets by A 2+4
Hence Days required to produce x widgets by A 6

Hence Days required to produce 52x widgets by A 52×6=15 Day


flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Time and Work
MATHEMATICS
Watch in App
Join BYJU'S Learning Program
CrossIcon