A company manufactures two types of screws A and B. All the screws have to pass thorugh a threading machine and a slotting machine. A box of type A screws requires 2 min on the threading machine and 3 min on the slotting machine. A box of type B screws requires 8 min on the threading machine and 2 min on the slotting machine. In a week, each machine is available for 60 h. On selling these screws, the company gets a profit of Rs 100 per box on type A screws and Rs 170 per box on type B screws.
Formulate this problem as a LPP given that the objective is to maximise profit.
Is molecular mass , atomic mass , gram molecular mass, gram atomic mass one mole.
(Like, is 12amu C one mole particles)