(i) F
10 pipes fill the tank in 24 min.
1 pipe will fill the tank in 24 10 min. (Less pipes, more time taken)
8 pipes will fill the tank in = 30 min (More pipes, less time taken)
(ii) T
8 men finish the work in 40 days.
1 man finishes the work in 840 days. (Less men, more days taken)
10 men will finish the work in = 32 days (More men, less days taken)
(iii) T
A 6 m tall tree casts a shadow of length 4 m.
A 1 m tall tree cast a shadow of length m.
A 75 m tall pole will cast a shadow of length =50 m
(iv) T
1 toy is made in h. (Less toys, less time taken)
12 toys can be made in = 8 h (More toys, more time taken)