A can do 12 of a work in 5 days. B can do 35 of the same work in 9 days and C can do 23 of that work in 8 days. All three of them if they work together will able to complete in 4 days.
True
A can do the entire work in 10 days
B can do the entire work in 9×53 days = 15 days
C can do the entire work in 8×32 days = 12 days
∴(A+B+C)′s amount of work done in one day
=110+115+112=6+4+560=1560=14 [LCM of 10, 15, and 12 = 60]