Two men can do a piece of work in 6 hours and 4 hours respectively. After the first has worked for 2 hours, he is joined by the other. By when should the work be completed.
Let the two men be A and B.
Given,
A can do a piece of work in 6 hours and B in 4 hours.
A's 1 hour work =16
B's 1 hour work =14
Both (A+B)'s 1 hour work =16+14=512
After the 1st (i.e. A) has worked for 2 hours, he is joined by the other (i.e. B)
A's two hour work =2×16=13
Remaining work =1−13=23
512 work is done by (A+B) in 1 hour.
23 work is done by (A+B) in 125×23=85 hours
Total time taken to complete the work =2+85 hours
=185 hours =335 hours =3 hours +35×60 minutes =3 hours 36 minutes.
Hence, the work will complete in 3 hours 36 minutes.