The correct option is B 10 days
Work done by X in 4 days =(120×4)=15
Remaining work =(1−15)=45
(X+Y)'s 1 day's work =(120+112)=860=215
Now, 215 is work done by X and Y in 1 day.
So, 45 work will be done by X and Y in (152×45)=6 days.
Hence, total time taken =(6+4) days =10 days.