250 J work is done to lift a bucket of mass 10 kg at a certain height. Calculate the height through which the bucket is lifted. Consider acceleration due to gravity as 10 .
Given:
Mass of the bucket = 10 kg
Work done on the bucket = 250 J
Calculation:
We know that the work done on lifting a mass m through a height h = mgh
Hence, the height through which the bucket is lifted (h) is 2.5 m.